MARC Ratings has affirmed its AA+IS rating on Pulau Indah Power Plant Sdn Bhd’s (PIPP) RM3.0 billion Islamic Medium-Term Notes (IMTN) Programme (Sukuk Wakalah), with a stable outlook.
PIPP owns and operates a 2x600MW combined-cycle gas turbine (CCGT) power plant in Pulau Indah, Selangor, under a 21-year power purchase agreement (PPA) with Tenaga Nasional Berhad (TNB, AAA/Stable) that expires in February 2046.
The rating affirmation reflects the plant’s stable operating performance, with key operating metrics remaining within expectations. The rating continues to be underpinned by the strength of PIPP’s PPA with TNB, which effectively transfers demand and fuel price risks to the offtaker, subject to plant performance. Other rating strengths include the plant’s proven CCGT technology and strong projected cash flow generation, as reflected by a sensitised minimum post-distribution finance service coverage ratio (FSCR) of 2.16x. The rating is moderated by the risk of unforeseen operational disruptions that could adversely affect financial performance.
Since commencing operations in March 2025, the plant has not experienced any major outages. As at end-June 2026, the unplanned outage rates for Units 1 and 2 stood at 3.38% and 2.98%, respectively, below the PPA limit of 4.0%. Consequently, PIPP received full capacity payments of RM191.1 million in 2025 and RM113.0 million in 1H2026.
Energy payments amounted to RM1,064.2 million in 2025 and RM646.5 million in 1H2026. In 2025, the plant’s heat rate exceeded the PPA benchmark by 1.4%, broadly in line with commissioning test results. PIPP received performance liquidated damages (LD) from the engineering, procurement, construction and commissioning (EPCC) contractor for the shortfall. In 1H2026, the average heat rate exceedance increased to 2.1%, partly due to higher fuel consumption during plant restarts following planned outages in March 2026 and several tripping events. Excluding March 2026, the heat rate exceedance remained within the expected level of 1.4%.
In 2025, PIPP received RM521.0 million in delay and performance LD compensation from the EPCC contractor. Of this amount, RM213.0 million was utilised in 1H2026 to redeem redeemable convertible preference shares held by common shareholders. The remaining proceeds are expected to be distributed in 2028. As at end-June 2026, PIPP’s cash and bank balances stood at RM359.2 million, providing adequate liquidity to meet the RM60.3 million sukuk profit payment due on 27 November 2026.
Under the base-case projections, average and minimum pre-distribution FSCRs with cash are projected at 3.10x and 2.27x, respectively. Cash flow resilience remains strong under moderate stress scenarios, including a 2% increase in outages and a 2% deterioration in heat rate over the sukuk tenure.